2190 Boul. Dagenais West TEL: 514.337.4415LAVAL (QUÉBEC) FAX: 514.337.4029CANADAH7L 5X9 [email protected]
REPLACEMENT PUMP MODELS10ALL STAINLESS STEEL5 GPM 1-11/4” DISCHARGE MODELS HP V Wire Stage101124 1/2 115 2 13101125 1/2 115 3 13101126 1/2 230 2 13101
ALL STAINLESS STEEL SERIESPump headModels Description111127 13 stages111135 18 stages111145 22 stages111154 26 stages111128 9 stages111136 12 stages11
12TROUBLE SHOOTING GUIDE CHECKLISTNEVER MAKE ADJUSTMENTS TO ANY ELECTRICAL APPLIANCE OR PRODUCT WITH THE POWERCONNECTED. DON’T JUST UNSCREW THE FUSE O
SAFETY INSTRUCTIONS:This fine pump that you have just purchased is manufactured with the highest qualitymaterials and workmanship. Before installation
3INSTALLATION STEPMaterial required for a drilled well applicationToolsScrewdrivers, hacksaw to cut pipe, knife to assist in pipe cutting, round file
Shrinking can be accomplished through the use of a thermo gun or flame torch with a utilityhead or other broad flame. Begin at one end of tubing. Keep
STEP 9ELECTRICAL INSTALLATIONWe recommend that a licensed electrician be employed to do wiring to the pressure switch.Permanently ground the motor in
6Lay the pump on the ground a foot or two from the well head with the discharge end pointingaway from the well. Connect the power cables to the motor
7Roll out the submersible pump cable on the ground along side of your 1” plastic Poly pipe.At 5 foot intervals, using your electrical tape, tape the c
8When using a pressure tank with your pump, we recommend that you install a captive aretank where the air pressure is injected at the factory (See our
AIR PRESSURE TANK INSTALLATION“Free-Standing” type tanks have to be installed offset from your pump, and in the discharge line coming fromyour pump’s
Comments to this Manuals